Contracted Logistics
Support (CLS)

End-to-end Logistics & Sustainment

Hammerstone provides Contracted Logistics Support (CLS) for organisations operating in demanding environments across Defence, mining, oil and gas and critical infrastructure.  Integrating logistics operations, engineering assurance, Integrated Product Support and digital insight, to keep systems operating safely, reliably and continuously where access, infrastructure and resupply are constrained. CLS means Hammerstone manages the logistics and sustainment so customers can focus on their core mission, with field-proven delivery across remote and austere environments.

What is Contracted Logistics Support & When DOes it Matter?

Contracted Logistics Support is a model where a specialist partner takes responsibility for planning, delivering and sustaining logistics and support services on behalf of the customer. In simple terms, CLS means we manage the logistics and sustainment, so our customers can focus on their core mission or operations — whether that’s Defence capability, industrial production or remote service delivery.

CLS matters most when internal logistics models are not viable or not sufficient. Remote operations with constrained resupply. Deployed systems that must function without specialist on-call support. High-consequence environments where logistics failure has immediate operational, safety or financial impact. In these conditions, organisations need a partner who takes end-to-end accountability — not a supplier who delivers equipment and moves on.

CLS is particularly valuable in environments where logistics failure has serious consequences. Defence, mining, oil and gas and remote infrastructure operations require systems that can be deployed, operated and sustained with minimal external support. Hammerstone specialises in these conditions — integrating logistics operations, engineering assurance, safety and compliance to ensure dependable outcomes in austere environments.

What Can Hammerstone CLS Include?

Support can range from targeted assistance through to full end-to-end responsibility.
Hammerstone’s CLS services are tailored to each customer and may include:
Hammerstone’s CLS offerings can also include:

What Makes Hammerstone's CLS Approach Different?

Hammerstone delivers Contracted Logistics Support services purpose-built for remote, complex and high-consequence operations.

Designed for reliability, adaptability and continuity. This ensures systems are not only deployed successfully, but remain operational, supportable and safe over their full lifecycle. Our CLS approach combines:

Logistics Operations

Planning, coordination and delivery of logistics and sustainment activities — from supply chain management through to field-level operation and support of deployed systems and infrastructure.

Integrated Product Support

IPS disciplines embedded into CLS delivery — supportability engineering, maintenance planning, spares management and technical data ensuring the system can be maintained, supplied and supported through life

Engineering & Systems Assurance

Systems engineering and technical assurance ensuring the solution is built to survive real-world operational conditions, meets compliance requirements and performs reliably throughout its service life.

Digital Insight & Continuous Improvement

ReadyFleet™, RMAS and operational data platforms providing real-time system visibility, automated monitoring and the feedback loops that drive continuous improvement over the engagement.

WHy do organisations Choose Hammerstone's Contracted Logistics support?

1. Reliability & Availability

Improve reliability and availability of critical assets — with a partner who takes end-to-end accountability for sustaining systems, not just supplying them.

2. Specialist Capability Access

Access specialist logistics, engineering and sustainment capability — without building and maintaining that capability in-house for engagements that don't require a permanent internal function.

3. Long-term Continuity

Maintain continuity of service over long periods — with a partner invested in the long-term performance of the system, not just the initial delivery.

4. Reduced Operational Risk

Reduce operational risk and through-life costs — by transferring logistics and sustainment responsibility to a specialist rather than managing it internally with limited resources.

5. Remote Operations Enabled

Enable operations in remote or infrastructure-limited locations — with a CLS partner who has field-proven experience in exactly these environments.

CLS delivered in Austere environments across defence, remote communities and industry

Hammerstone has extensive experience supporting Defence, mining, oil and gas customers operating in geographically isolated and resource-constrained locations. Our work includes the planning, delivery and sustainment of deployable logistics and infrastructure systems that must function reliably with limited access, constrained resupply and minimal supporting infrastructure.

 

Hammerstone’s CLS experience includes supporting Defence programs such as the Army Aboriginal Community Assistance Program (AACAP). As part of its Contracted Logistics Support delivery, Hammerstone has designed, delivered and sustained deployable Wastewater Treatment Systems in support of Defence operations under the Army Aboriginal Community Assistance Program (AACAP). This includes the development of a militarised, 20-foot containerised Wastewater Treatment System, engineered to meet specific Defence requirements for deployability, environmental compliance, safety and ease of sustainment in remote locations. The system was designed to operate with minimal infrastructure and limited external support, providing reliable and environmentally responsible wastewater processing for deployed personnel and remote communities.

 

Operational use and evaluation of the system has informed continuous improvement and future capability development — demonstrating Hammerstone’s ability to deliver and sustain complex, deployable infrastructure as part of an integrated CLS solution.

Jigalong, WA, 2019

Supply, freight, commission and decommission of a 28kL wastewater treatment plant for a 4-month AACAP deployment in Jigalong, Western Australia. Hammerstone’s first operational WTS deployment.

Gapuwiyak, NT, 2022

Provision, installation and maintenance of a wastewater treatment plant for 17 Construction Squadron in support of AACAP 2022, conducted in Gapuwiyak, Northern Territory.

Amata, SA, 2024

Provision, installation and maintenance of two wastewater treatment plants for 17 Construction Squadron in support of AACAP 2024, conducted in Amata, South Australia.

Further CLS and deployable Logistics Programs

RRPWP — Army water pumps (CASG, active 2026–27)

Prime contract with CASG for the Raw and Reticulation Potable Water Pumps Project — replacing the Army’s water pump fleet with 84 pump units designed for interchangeable raw and potable water operations. CLS scope: supply, modification and delivery. Active contract. 

AACAP — Four remote deployments (Army, 2019–2026)

Four Contracted Logistics Support deployments supporting the Army Aboriginal Community Assistance Program across remote Australian communities — Jigalong WA (2019), Gapuwiyak NT (2022), Amata SA (2024), Yungngora WA (2026). Scope: provision, installation, operation and maintenance of deployable wastewater treatment systems. All prime contracts. Operational experience has directly driven system improvements across each deployment.

WWTS — System development for CLS (DIH 2022–23)

Development of the militarised 20ft deployable WTS under the Army Innovation Day (AID2021) program — purpose-built for ADF CLS deployments. The system eliminates reliance on third-party contractors, reduces earthworks and enables remote autonomous control. Prime contract with DIH.

World Fuel — Deployable bulk fuel (WFS-A, 2023–26)

ILS management, RAM and LSA analysis embedded in the World Fuel Services delivery team for the JP8190 Deployable Bulk Fuel Distribution System. Demonstrates CLS delivered as an embedded capability within a prime delivery team — not just as a prime contractor. Remote, coalition logistics context.

D-JMILS — Digital CLS layer (DIH, 2019–2025)

D-JMILS provides the in-transit visibility and digital monitoring layer that enables data-driven CLS decision-making — tracking logistics platform identity, condition and location across the supply chain. CLS engagement proof: Hammerstone designed the system to contribute to the National Logistics Support Concept and Defence logistics frameworks.

How Does Hammerstone underpin CLS with IPS & Engineering?

Hammerstone’s CLS services are underpinned by Integrated Product Support and systems engineering disciplines, ensuring supportability, reliability and safety are designed in from the outset.

 

For a CLS customer, this means the systems Hammerstone delivers are not just operationally effective at handover — they are engineered for the support environment from the start. Maintenance concepts are developed before delivery. Spares requirements are provisioned on analysis. Technical data is available from introduction to service. And the CLS engagement includes the engineering assurance to manage configuration changes and continuous improvement throughout the lifecycle.

What environments is Hammerstone's CLS designed for?

Hammerstone’s Contracted Logistics Support capabilities are designed for environments where reliability matters and downtime is unacceptable.

These include:

Remote and geographically isolated operations — where resupply is constrained, access is limited and external support cannot be assumed

Deployed Defence operations — where the system must operate in field conditions without specialist on-call maintenance support

Mining, oil and gas — where downtime has immediate financial and safety consequences and the operating environment is harsh

Remote infrastructure and community services — where the system must be operated by non-specialist personnel and function reliably over extended periods

High-consequence regulated environments — where compliance, safety and auditability are non-negotiable

By integrating engineering, logistics operations and digital insight, Hammerstone provides dependable, scalable CLS solutions that enable organisations to operate confidently, no matter how remote or challenging the environment.

Hammerstone's Contracted Logistics Support capabilities are designed for environments where reliability matters and downtime is unacceptable. We don't just deliver systems. We take responsibility for keeping them operational — wherever they are deployed, for as long as they need to run.

Frequently asked questions

What is Contracted Logistics Support?

Contracted Logistics Support is a model where a specialist partner takes responsibility for planning, delivering and sustaining logistics and support services on behalf of the customer. In simple terms, CLS means we manage the logistics and sustainment, so our customers can focus on their core mission or operations — whether that’s Defence capability, industrial production or remote service delivery. Support can range from targeted assistance through to full end-to-end responsibility.

Hammerstone CLS is tailored to each engagement and can include: operation and sustainment of equipment, systems and infrastructure; maintenance, repair and technical support; supply chain and spares management; logistics planning and coordination; support for deployed, remote and high-risk environments; and through-life support and continuous improvement. Underpinning all CLS delivery is Hammerstone’s integrated approach: logistics operations, engineering assurance, Integrated Product Support and digital insight working together.

No. While Hammerstone’s CLS capability is proven in Defence environments — including four AACAP deployments across remote Australian communities — the same approach applies to mining, oil and gas, remote infrastructure and any industrial operation where logistics failure has serious consequences and systems must function in geographically isolated, resource-constrained conditions. The environments are different; the challenges of remote, austere and high-consequence logistics are the same.

Standard logistics contracting typically covers supply and transport. Hammerstone CLS goes further — embedding Integrated Product Support disciplines (maintenance planning, spares management, technical data), systems engineering assurance and digital monitoring into the CLS engagement from the outset. This means the systems delivered are engineered for supportability, the maintenance concept is validated before deployment, and operational data from ReadyFleet™ and RMAS drives continuous improvement throughout the engagement rather than after it ends.

Hammerstone’s primary CLS product is the Modular Wastewater Treatment System (WTS) — field-proven across four remote deployments in support of the Australian Army’s AACAP programme from 2019 to 2026. Hammerstone also provides CLS-aligned ILS and sustainment support for deployable fuel distribution systems and logistics infrastructure. For organisations needing deployable, self-contained systems that can be operated and maintained with minimal infrastructure and technical overhead, the WTS is Hammerstone’s proven CLS platform.